- CSR VIC
Oaklands Junction Quarry Replacement of existing Allen Bradley
ControlView SCADA System with Citect for Windows running on three PC's.
Remote diagnostic and maintenance.
- CSR NSW
Albion Park Quarry (RFS Electrical) Replacement of existing
Control Panel with SCADA System consisting of two PC's running Citect
for Windows
- Permian
Resources NSW - SRA Quarry. Development of SCADA System consisting
of Single PC with Citect for Windows monitoring Crushing Plantat SRA Quarry
Bombo .
- CSR NT
Palmerston Quarry; Replacement of existing Allen Bradley ControlView
SCADA with SCADA System consisting of Single PC with Citect for Windows
- CSR ACT
Cooma Road Quarry; (RFS Electrical) Development of SCADA System consisting
of Single PC with Citect for Windows monitoring Primary Crushing Stage
of CSR's Cooma Road Quarry.
- CSR NSW
Penrith P3 Crushing Plant PLC/Scada systems and Fire protection Design
AUD$ 100,000
- CSR NSW
Glebe Island Port Unloading Facility Engineering, PLC/Scada systems
AUD$ 60,000
- CSR
NSW Penrith Quarry. Development of SCADA System consisting of two
PC's with Citect for Windows.Remote diagnostic and maintenance.
-
China
- Rock
Crushing Plants at Hong Kong International Airport. Design, manufacture
& install/commission HK$ 1,100,000
- Ji County
Rock Crushing Plant (C.S.R.)Design, install H.V. substation/motor
control/plc main switchboards US$730,000
- Huang
Pi Rock Crushing Plant Commissioning/training and maintenance of plant
US$ 20,000
-
USA and South
America
- Equatorial
Mining NL Feasibility study and pricing Leonor Mine Chile, Generation
H.V./L.V. installation and PLC/Scada auto control (fee basis) AUD$ 50,000
- Equatorial
Mining NL Feasibility study and pricing removal and Relocation of
Chok Olympie Mine Chile to Peru Generation H.V./L.V. installation and
PLC/Scada auto control (fee basis) AUD$ 40,000
- American
Aggregates Replacement 1200kW AC Dredger S/R drives with DC variable
speed drives Michigan, Indiana and Ohio. Engineering and Project Management
(fee basis) AUD$ 45,000
- Nui Guinea
Gold NL San Cristobal Mine Design, manufacture, installation and commissioning.
Generation H.V./L.V. installation and PLC control AUD$ 1,200,000
-
Australia
- HydroElectric
Commission - TAS, Australia. (NEC Radio Eng) Development of Network
Management System consisting of Four PC's with Citect for Windows SCADA
Software. Creation of Citect Project and On-site Commissioning. This project
monitored approx. 200 Radio's and involved approx 30,000 separate points.
- Melbourne
Casino Power Co-Generation Plant - (Elecraft (AUST) P/L) Development
of SCADA System consisting of Four PC's with Citect for Windows monitoring
Standby Power Generators for Melbourne Casino.
- CSR NSW
Penrith P1 Crushing Plant Design install HV and LV distribution equipment
AUD$120,000
-
China
- Aircraft
Maintenance Facility at Tsuen Kwan O (Hong Kong). Supply form 4 motor
control centres(HAECO/HAESEL) HK$ 11,500,000
- Aircraft
Tank Fuelling Facility at Hong Kong International Airport. Supply
explosion proof distribution boards HK$ 780,000
- Standby
Generation Facility at Hong Kong International Airport, Manufacture
generator neutral grounding and engine control and synchronising panels.
HK $350,000
- Tianjin
Chemical Manufacturing Plant (SmithKline Beecham) Design and manufacture
of distribution switchboards US$ 170,000
-
Taiwan
- Concrete
Pipe Making Facility Design/Project Manage H.V./L.V. substations N.T.$
1,530,000
-
Australia
- SA Water
- Bolivar DAF South Austrlia - (Thames Water Asia Pacific) SCADA system
consisting of four PC's with Citect for Windows software communicating
via Remote dial-up networking
- South
East Water - Hastings STP - (Thames Water Asia Pacific) Upgrade of
existing Sewage Treatment Plant form manual control to SCADA System consisting
of three PC's with Intellution iFix ver2.1 SCADA software communicating
via Remote dial-up networking (SCADA only)
- South
East Water - Rosebud STP - (Thames Water Asia Pacific) Addittion of
UV Disinfection Treatment Plant to existing Intellution iFix SCADA system
(SCADA Only)
- Yarra
Valley Water - Brushy Creek STP - Development of SCADA System consisting
of Single PC with Citect for Windows monitoring Brushy Creek Sewage Treatment
Plant (SCADA only)
-
Indonesia
- Wastewater
Treatment Plant - Batu Hijau Project Sumbawa Indonesia. (Thames Water
Asia Pacific) System consisted of Allen Bradley SLC series PLC with Allen
Bradely Panelview terminal and separate PC running Citect for Windows.
On-site commissioning Only
-
Malaysia
- Water
and WasteWater Treatment Plant - Kerteh Malaysia.(Thames Water Asia
Pacific) System consisted of Two Seimens S5-115h (Hot Standby) PLC's with
two Industrial PC's with Wizcon (Dos) SCADA Software. On-site commissioning
Only
-
China
- Dachang
WTP, - Shanghia CHINA.(Thames Water Asia Pacific) Development of SCADA
System consisting of Two PC's with Citect for Windows monitoring Dachang
Water Treatment Plant.
- Siu Ho
Wan Water Treatment Plant, Thames Water - (Hong Kong). Commissioning
PLC/Scada systems HK$ 370,000
- Ma On
Shan Water Treatment Plant (W.S.D.- Hong Kong) Installation/commissioning
of electrical, PLC/Scada systems HK$ 5,000,000
- Sewage
Treatment Plant Drainage Services Dept. (Hong Kong) Installation/commissioning
of electrical, P.C.S., PLC/Scada systems HK$ 2,000,000
- Siu Ho
Wan Water Treatment Plant, Thames Water - (Hong Kong). Commissioning
PLC/Scada systems HK$ 370,000
- Ma On
Shan Water Treatment Plant (W.S.D.- Hong Kong) Installation/commissioning
of electrical, PLC/Scada systems HK$ 5,000,000
- Sewage
Treatment Plant Drainage Services Dept. (Hong Kong) Installation/commissioning
of electrical, P.C.S., PLC/Scada systems HK$ 2,000,000
-
Thailand
- Pathum
Thani WTP, THAILAND - (Thames Water Asia Pacific) Development of SCADA
System consisting of Two PC's with Citect for Windows monitoring Pathum
Thani Water Treatment Plant.